Can I order a kitchen from the estate agent's floor plan?

No — use it to plan, but always measure the room yourself before you order. A listing's floor plan usually has no scale and no one standing behind the numbers, and a kitchen ordered 5 cm wrong can't be fixed afterwards.

Short answer: use the listing's floor plan to plan the kitchen — where the fridge should go, whether there's room for an island — but never order from it. A listing plan usually has no scale, no dimension chains and no professional standing behind the figures, and errors of several centimetres per room are common. A kitchen is made of modules in fixed widths (typically 20, 30, 40, 50, 60 and 80 cm, plus a filler strip), and a wall length that's out by 5 cm means either one module too many or a visible gap. Measure the wall yourself, corner to corner, at three heights, and give the kitchen company your own figures. Most kitchen companies do send their own surveyor out before production starts — but only after you've signed an agreement based on your numbers.

Why a kitchen is especially sensitive to wrong measurements

A kitchen isn't one piece of furniture — it's a row of modules in fixed widths that have to add up to the wall's length. That's why a measuring error bites harder in a kitchen than almost anywhere else in the home.

Here's the sum. You plan a kitchen wall from the listing, which shows 3.60 m. You put together: 60 cm dishwasher + 80 cm sink + 60 cm hob + 60 cm cabinet + 60 cm cabinet + 40 cm tall unit = 360 cm. Perfect on paper.

You measure it yourself and find 3.54 m. Those 6 cm don't exist as a module, and you can't shave 1 cm off every cabinet. The fix is either to swap the 40 cm tall unit for a 30 cm one and live with a 4 cm filler strip, or to move a wall. If the error runs the other way — the wall is 3.66 m — you get a 6 cm gap against the wall that has to be hidden with an infill panel, and it shows.

The same goes for depth. A standard base cabinet is 60 cm deep, the worktop typically 62-64 cm. If the room is 8 cm narrower than the drawing says, those 8 cm disappear from the walkway in front of the kitchen — and as a rule of thumb you need 90-120 cm of clear walkway in front of a kitchen run for two people to move at once, and at least 120 cm between two facing runs so doors and the dishwasher can open.

How to measure a kitchen wall properly

Measuring a kitchen isn't one measurement. Do this for every wall the kitchen will run along:

  1. Measure the wall's length at three heights: at the floor, at worktop height (about 90 cm) and at wall-cabinet height (about 150 cm). If the three figures don't match, the wall isn't plumb — and always use the smallest figure as your working length.
  2. Check the corner. Use a square, or measure the diagonals: if the room is square, the diagonals are equal. If they're not, plan for an infill at the corner.
  3. Measure the floor's level. Lay a spirit level or a long straight batten on the floor along the wall. If the floor drops 1.5 cm over 3 metres, the cabinets need adjusting and the plinth height changes.
  4. Measure and note everything that breaks the wall: the window's width, height and distance to the corner; the door's width and swing; the radiator's position; drain and water connections; sockets; the ventilation duct's location.
  5. Measure the ceiling height in several places if wall cabinets are to run all the way up.

Write the figures down in millimetres, not "about three and a half metres". The kitchen company's configurator works in millimetres, and that's exactly where the errors creep in if you round off.

What the listing's floor plan is actually good for

The listing's floor plan isn't useless — it's just a different tool. As a rule it's correct about which rooms exist and how they sit relative to each other, and that's exactly what you need for planning:

So use the listing plan to make the decisions, and your own measurements to order. They're two different decisions, and they shouldn't rest on the same piece of paper.

Getting a measured kitchen plan without paying a draughtsman

You don't need an architect to get a measured starting point for the kitchen company. There are three routes:

Bring the screenshot or PDF to the kitchen dealer along with your notes on window, door, drain and radiator. The dealer uses it to draw up a proposal, and you have a basis to check that proposal against.

The kitchen company's own survey — when does it happen?

Most kitchen suppliers send a surveyor out before production begins. That's good, but it's not an excuse to skip your own measuring, for two reasons:

  1. The price is agreed before the survey. The quote you sign is calculated from the figures you or the salesperson provided. If the survey turns up something different, the number of modules changes — and so does the price.
  2. The layout is decided before the survey. The choice of island or no island, whether the sink sits under the window, and whether there's room for a dishwasher beside it, gets made on the basis you bring in.

Also bear in mind that the supplier's survey usually covers the kitchen, not the building. If a wall needs removing to open the kitchen onto the living room, that isn't part of it — and neither the kitchen company, an app, nor a floor plan can tell you whether that wall is load-bearing. That needs a building surveyor or a structural engineer who can look at the actual construction.

A short checklist before you sign

Tick all six, and you're in a far better position than the person who ordered from a listing floor plan — however tidy it looked.